Temporary Accomm/garage- Pt-3

Another quick trip an back to Blackball today. The garage framing materials were being delivered at 12.30 from Mitre 10 and we wanted to be there to sort the container out first. We left pretty much as planned but there were a few delays on the way mostly road works and the usual idiots. We arrived at 12.35 to find the driver waiting patiently for us. We were excited to see the slab was down which means we can start building the framing at xmas. Scott Secker, the builder that did the slab, was also there doing the prep for the carport next to the garage.

Once again we were lucky with the weather and dodged the rain – another beautiful day in Blackball. 🙂